The goal of the JKB Thrust Renovation Project was to replace the existing, adjustable Wenger system with a brand new modular system from Steeldeck Inc. that would be rated to hold our drivable JLG lift. The project was engineered, designed, and fabricated by Steeldeck Inc. It was then installed by myself, my supervisor, and four of our students under the direction of two Steeldeck employees over the course of one week.Â